Four-Step Fusion Process
Step 1
Cut pipe to the required length using a cutter, mark the welding depth on
the pipe, ensure that the indicator light on the welding tool signals that the tool is
hot enough (260oC ) for welding.
Step 2
The tip of pipe to be welded is shaved by special Vesbo shaver
to remove outside PP-R layer and aluminium foil. (applicable
only to PN 25 stable pipes with aluminium foil)
Step 3
Push the pipe and fitting into the welding adaptors, applying even
strength at both ends. Do not twist or turn the pipe and fitting while pushing. Wait until
heating time is reached.
Step 4
When the welding heating time is reached, remove both pipe
and fittings together, again without twisting or turning while
pulling out of the welding adaptor. Almost immediately , push
both pipe and fitting together until the depth is reached.
It is possible to adjust the joints for more than 5 degrees
during this time. Joint is now completed.
Welding Depth,Heating,Welding and Cooling Time
The table below provides the necessary information for a good welding joint for various Vesbo pipe and fitting size (applies to Stable pipes also).